Delayed yard trimmings collection for some residents

The Department of Public Works is aware that some residents may have recently experienced delayed yard trimming collections. Solid Waste crews are working evenings and weekends and will continue to do so in an effort to meet the enhanced demands of our customers. Residents affected by delays should leave yard trimmings curbside as crews continue to service impacted areas.
Citywide Neighborhood Watch Training July 24, 2021


Police Reform Town Hall 1 -Small Business
Districts # 1 & 5 Top Ranking KBA Report – June 2021


Independence Day holiday solid waste collection schedule changes

Zone 6 Town Hall Meeting with APD 6/30/21 at 6 p.m. – CANCELED
From the Atlanta Police Department’s Public Affairs Unit: We will be canceling tonight’s town hall meeting with Zone 6 as we are currently investigating an officer-involved shooting. We apologize for the cancelation and will reach out to you once we set a new date.

Atlanta Police Department’s Public Affairs Unit invites you to join APD’s virtual town hall meeting that will allow residents of Zone 6 to connect with the Atlanta Police Department and address any concerns. The event will be held virtually via Zoom on Wednesday, June 30, 2021 from 6 p.m. to 7:30 p.m. Chief Rodney Bryant, members of APD’s Executive Command Staff, and Zone 6 leadership will be participating.
Please note that those joining the Zoom call must be residents or business owners of Zone 6. The deadline to register is Tuesday, June 22. If you have any questions, please contact Angie Rosete at frosete@atlantaga.gov
Register: https://docs.google.com/forms/d/e/1FAIpQLScVt8SNKgPiQd4XoITNKJ6xw0kSajGCG_KlXkOi25TOMF9MUw/viewform
You can take charge of your health with a free HIV self-test!

You can take charge of your health with a free HIV self-test! Learn more about getting a free self-test delivered right to you: https://together.takemehome.org
Download the ATL311 Mobile App Today!
NPU-W Bylaws Committee – Additional Meeting Scheduled
Please not that the NPU-W Bylaws Committee has added an additional meeting on July 14th at 6:30pm
- Online Meeting:
- To register in advance for this meeting click here.
- After registering you will receive a confirmation email containing meeting access link.
NPU W Monthly Project Dashboard Report – April 2021

quick status update on projects in design and construction:
Atlanta Ave (TCC)
Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.
Boulevard (TCC)
Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.
Glenwood Rd (TCC)
Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.
R.D. Abernathy/Georgia Ave (TCC)
Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.
Monroe/Boulevard (TCC)
Project is included in a package of citywide signal upgrades and intersection improvements. Package is being rebid due to a glitch with the previous bid submission process.
Glenwood LCI Match (Realignment at Moreland)
Construction is underway.
Ayr St Roadway Construction
Design is complete. This project is being bid as a part of the Unpaved Roadways Phase I package include 5th St/James St, Ayr St, and Newman Place (possibly de-scoped). The package will be advertised when design modifications for all four projects are completed.
Braeburn Roadway Construction
This project is being bid as a part of the Unpaved Roadways Phase I package originally bid at the end of December 2019. Bid package re-advertisement was delayed; a new bid schedule is being developed and should move forward in coming weeks.
South Boulevard Complete Streets
This is a concept design-only project. Concept design is complete. Constituents provided feedback on the concept design during two (2) public information open houses held in January 2021 and through February 26, 2021 via email. Feedback has been compiled and under ATLDOT review.
Monroe Dr/Boulevard Complete Street
Preliminary design is underway.
SR154 Memorial Drive Corridor Improvements
Concept design with comments addressed has been resubmitted for GDOT review and approval. The project will include new and expanded sidewalks, medians, lighting, tree plantings and other streetscape amenities, improved bus shelters, upgraded signalization, and additional turn lanes at intersections on Memorial Dr from Connally St to Grant St.
Glenwood/Moreland LCI Projects
Construction is underway.
Right of Way Acquisition and Install Lighting (Atlanta Beltine)
86.6% of total funding allotment has been paid; annual payments will continue until funding commitment is complete.
Downtown Special Events ITS
Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.
Signal Optimization and Detection Phase I
Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.
Smart Signal Systems Phase I
Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.
Please feel free to submit any questions regarding the projects listed in the monthly report to ATLDOT@atlantaga.gov.