NPU W Monthly Project Dashboard Report – April 2021

quick status update on projects in design and construction:

Atlanta Ave (TCC)

Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.

Boulevard (TCC)

Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.

Glenwood Rd (TCC)

Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.

R.D. Abernathy/Georgia Ave (TCC)

Final utility design expected from Georgia Power Company. Design will proceed pending results of Boulevard traffic calming study.

Monroe/Boulevard (TCC)

Project is included in a package of citywide signal upgrades and intersection improvements. Package is being rebid due to a glitch with the previous bid submission process.

Glenwood LCI Match (Realignment at Moreland)

Construction is underway.

Ayr St Roadway Construction

Design is complete. This project is being bid as a part of the Unpaved Roadways Phase I package include 5th St/James St, Ayr St, and Newman Place (possibly de-scoped). The package will be advertised when design modifications for all four projects are completed.

Braeburn Roadway Construction

This project is being bid as a part of the Unpaved Roadways Phase I package originally bid at the end of December 2019. Bid package re-advertisement was delayed; a new bid schedule is being developed and should move forward in coming weeks.

South Boulevard Complete Streets

This is a concept design-only project. Concept design is complete. Constituents provided feedback on the concept design during two (2) public information open houses held in January 2021 and through February 26, 2021 via email. Feedback has been compiled and under ATLDOT review.

Monroe Dr/Boulevard Complete Street

Preliminary design is underway.

SR154 Memorial Drive Corridor Improvements

Concept design with comments addressed has been resubmitted for GDOT review and approval. The project will include new and expanded sidewalks, medians, lighting, tree plantings and other streetscape amenities, improved bus shelters, upgraded signalization, and additional turn lanes at intersections on Memorial Dr from Connally St to Grant St.

Glenwood/Moreland LCI Projects

Construction is underway.

Right of Way Acquisition and Install Lighting (Atlanta  Beltine) 

86.6% of total funding allotment has been paid; annual payments will continue until funding commitment is complete.

Downtown Special Events ITS

Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.

Signal Optimization and Detection Phase I 

Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.

Smart Signal Systems Phase I

Most work completed on this citywide contract; will cover signal tech and traffic engineering work needed for Dekalb Ave Safety Improvements.

Please feel free to submit any questions regarding the projects listed in the monthly report to ATLDOT@atlantaga.gov.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s